time and then expire. The expired recovery points are removed during the following job run.

Note
If the group of jobs contains at least one job that isn’t a backup/backup copy job, does not support retention, or has had its retention settings changed since the previous run, only the Keep recovery points for option will be available.

  • In the lowest drop-down menu, specify (if applicable) whether you want the operation to run for failed source objects, stopped source objects, or all source objects.

  • Click the Run or Stop button to confirm your selection.