v5.7.2 Release Notes

Release Date: 31 August 2015

Fixed Issues in v5.7.2

  • VMware CBT: Powered Off VMs or VMs with small data changes caused long job runs

  • VMs that became unavailable cannot be properly removed from jobs

  • File level recovery for Windows may fail on certain configurations

Known Issues in v5.7.2

  • Encrypted repository is not supported on RHEL/SLES because required packages are missing on that systems

  • NFS datastores cannot be used with Flash VM Boot and Screenshot Verification

  • Flash VM Boot Job does not add a new VM in case a new child VM was added to a Backup Job

  • Microsoft Exchange Public folders are not supported for granular recovery

  • Microsoft Active Directory printers are skipped during import

  • Microsoft Exchange log truncation cannot be performed on some configurations